How much should an EV charger installer pay for a website? Less than a few installs clear, and GOV.UK shows why it matters

A driver claiming the chargepoint grant is sent to one government page to find someone allowed to fit it. The GOV.UK installer finder shows the ten nearest OZEV authorised installers, each with an address, a phone number and, if the business supplied one, a website link. On 15 September I ran it for fifteen postcodes across England, Scotland, Wales and Northern Ireland. In central London, all ten installers listed a website. Near Horncastle in Lincolnshire, two did.

Across ten smaller towns and cities, 54 of the 100 nearest authorised installers gave the customer nothing to click.

That list is where the price of a website should be judged. The customer already knows they want a charger and roughly what the grant covers. What they are doing on that page is picking one name out of ten, and the name they can check is the one they ring. So the fair price is whatever it costs to be checkable, measured against what one install puts in your pocket.

Quick answer

No more than a few installs clear in a year. A done-for-you site at £50 every four weeks is £650 a year, hosting and edits included. For a UK EV charger installer the money must buy specific things: OZEV authorised status, your NICEIC or NAPIT number, the chargers you fit, real install photos, and a site that matches your GOV.UK listing.

Only 83 of 150 authorised installers give GOV.UK a website

On 15 September 2026 the GOV.UK chargepoint installer finder showed a website link for 83 of the 150 nearest OZEV authorised installers across fifteen UK postcodes: 37 of 50 in five large cities, but only 46 of 100 in ten smaller towns and cities.

Nearest ten OZEV authorised installers listing a website, by postcode searched

GOV.UK installer finder, 15 September 2026. One central postcode per town, the ten results it returned, counted where a website link was shown.

Westminster, London10 of 10
Brighton9 of 10
Hereford7 of 10
Manchester6 of 10
Leeds6 of 10
Norwich6 of 10
Bridport, Dorset6 of 10
Helmsley, North Yorkshire6 of 10
Montrose, Angus5 of 10
Bideford, Devon5 of 10
Cirencester5 of 10
Launceston, Cornwall4 of 10
Llandrindod Wells3 of 10
Enniskillen3 of 10
Horncastle, Lincolnshire2 of 10

What a grant customer actually sees

Each result on the GOV.UK finder is a business name, a street address with map links, then a website, an email and a phone number where the installer gave them, and a line saying whether they do residential work, commercial work or both. There are no reviews, no photos and no prices. Nothing on that page helps a customer tell ten authorised installers apart, so the ones with a link get clicked and the ones without get a cold call or nothing.

What the count does not prove

A missing link means the listing shows no website, not that the business has none. Some of the installers without a link will have a site they never gave OZEV. For the customer on that page the effect is identical. Search your own postcode and look at your own entry before you spend a penny on anything else, because a site nobody is sent to is only half the job done.

One install can pay for the year

A website at £50 every four weeks costs £650 a year, thirteen payments rather than twelve, so an installer clearing £250 on a home charger fit covers the whole year with three installs.

Break-even, counted in installs

Website plan, one year£650
If you clear £150 an install5 installs
If you clear £250 an install3 installs
If you clear £400 an install2 installs
Every install after thatNo fee on it

The margins are illustrations, not market data. Put in what you actually clear after the unit, cable, protection and your time, and round up.

Why the billing unit matters

Four-weekly billing is thirteen payments a year, not twelve, and a price that reads monthly but bills every four weeks is £50 dearer over the year than it looks. Work it out on the annual figure. Any quote that will not give you one is hiding the part you most need.

What the grant does to the sum

Nothing to your margin, a lot to your conversion. The grant for flat owners and renters pays 75% of the cost of a socket, up to £500, and since 1 April 2026 the landlord and on-street parking grants cap at £500 a socket too. That turns a job a renter would put off into one they book this month, and only an authorised installer can do it. The website's job is to make that obvious to someone who has never heard of OZEV.

The page a grant customer checks before ringing

An EV installer's website has one job a general electrician's does not: prove OZEV authorisation and grant eligibility fast enough that a customer who arrived from GOV.UK does not go back to the list.

One OZEV authorised, said in those words Residential, commercial or both, matching the line on your GOV.UK entry. A customer who has just read that line is looking for the same words.
Two Your scheme and your number NICEIC, NAPIT, SELECT, OFTEC or ECA, whichever you were authorised through, with the registration number a customer can check on the scheme's own register.
Three Who qualifies for the grant, in one paragraph Flat owners, renters, landlords, households with on-street parking, workplaces. Up to £500 a socket, until 31 March 2027. Say that you make the claim.
Four The chargers you fit, by name Grant installs have to use a model on the eligible chargepoint model list, and customers who have done their homework arrive with a brand in mind.
Five Finished installs, photographed properly The unit on the wall, the parking space it serves, the house it is on. Not a stock photo of a car plugged in.
Six The same name and number as your GOV.UK listing A customer who clicks through and finds a different trading name or phone number assumes they have the wrong business.

Steps one and two are the EV version of a problem every registered trade has, and the placement rules are the same ones set out in how to show Gas Safe and NICEIC on your website: near the top, with the number, linked to where it can be checked.

Use the four claim photos twice

Since 1 April 2026, a grant claim needs four photos: a close-up of the chargepoint, its model and serial number, the chargepoint with its parking space, and a wide view of the building. You are already standing there taking them. Three of the four are exactly the gallery a customer wants to see, so keep a copy of each job, leave the serial number shot out, and send them over.

Get the nation right

The smart charge point regulations cover chargepoints sold in England, Scotland and Wales, and do not apply in Northern Ireland, while the grant covers all four nations. An installer in Enniskillen whose site copies a compliance line from a Great Britain template is telling customers something slightly wrong.

Most electricians fitting chargers do not say so where Google reads

Of 828 UK electrician websites in my own lead sheets, 92 mention EV charging in their page title or Google description, only 22 put it in the title, and 5 name OZEV at all.

828Electrician sites read, 76 towns
92Mention EV work in title or description
22Put it in the page title
5Name OZEV authorisation

These are the title and description of each homepage, read when the lead sheets were built between 30 August and 2 September 2026, not every page of every site. Plenty of those electricians fit chargers and say so further down. But the title is the line Google usually shows as the link, and the plainest statement of what a business does, which is the argument behind why so many trade businesses are invisible to AI search. Five in 828 is an open goal for anyone who is authorised and says so.

Which plan fits an EV installer

An electrician adding chargers to an existing trade needs the £50 Website plan; a firm doing EV work across several towns needs a page per town, which is what the £100 Groundwork plan adds.

Sitework plans against the shape of an EV business
Plan, every four weeksFitsWhat it adds
Website, £50A sparky with chargers as one service, one base townUp to six pages, hosting, domain, unlimited small edits, click-to-call
Groundwork, £100An EV and solar firm covering several townsFour town and service pages every four weeks, Google Business Profile posted monthly, review requests
Local Reach, £350A regional installer chasing workplace and commercial workSixteen search-led posts every four weeks, keyword and area research

What the Website plan build looks like for this trade is on the EV charger installer website design page, and the wider layout an electrician's site needs is in the electrician website design guide.

What not to pay for

A site you have to log into yourself to change a grant figure. When the socket cap went from £350 to £500 on 1 April 2026, every installer page quoting £350 went out of date that morning. Edits should be a text message, not an afternoon.

When the listing alone is enough

If every install you do comes through a car dealer, an energy supplier or a charger brand's own referral scheme, you are not the one being chosen off the GOV.UK list, and a cheap one-page site with your registration on it is plenty.

Do not build the pitch on a grant with an end date

The residential and workplace chargepoint grants are funded until 31 March 2027, and three OZEV schemes closed to new applications on 31 March 2026, so an EV installer's website should sell the install and treat the grant as a current offer, not the reason to buy.

The April 2026 changes closed the staff and fleets grant, the commercial landlord chargepoint grant and the residential landlord infrastructure grant. Any installer page that led with one of those was out of date the next morning. Put the grant on one page, link to it from everywhere else, and it is one edit when the rules move again.

Bottom line. An EV charger installer should pay what two or three installs clear in a year for a website, and make sure that money buys the four things a GOV.UK customer checks: authorisation, registration, real installs and a link that works.

EV charger installer websites: FAQ

How much should an EV charger installer pay for a website?

No more than a few installs clear in a year. A done-for-you site at £50 every four weeks is £650 a year across thirteen payments, with hosting, the domain and edits included, so an installer clearing £250 on a home charger fit covers it with three jobs. Pay more only for extra work you need, such as town pages or a Google Business Profile run for you, not for a bigger build.

Do I need to be OZEV authorised to fit chargers under the grant?

Yes. GOV.UK says a customer claiming the chargepoint grant must use an OZEV authorised installer and an eligible chargepoint. To apply for authorisation you need registration with a competent person scheme, NAPIT, NICEIC, SELECT or OFTEC for residential work, or the matching ECA membership. Only installations carried out after the date you are authorised are eligible for grant funding, so apply before you quote grant work.

Does the GOV.UK installer finder show my website?

It shows a website link where one is on your listing, next to your address, email and phone number. On 15 September 2026, across fifteen postcodes in England, Scotland, Wales and Northern Ireland, 83 of the 150 nearest authorised installers had a link. Search your own postcode on the finder to see exactly what a grant customer sees next to your name.

What photos does OZEV need for a chargepoint grant claim?

Four, since 1 April 2026: a close-up of the chargepoint, one showing its model and serial number, one of the chargepoint with its parking space, and a wide view of the building or space where it was fitted. Three of those four also make good gallery photos for your own website, leaving the serial number shot out, so keep a copy of every job.

When does the EV chargepoint grant end?

The grant for flat owners and renters, the residential landlord chargepoint grant, the on-street parking household grant and the Workplace Charging Scheme are funded until 31 March 2027, at up to £500 a socket from 1 April 2026. The staff and fleets grant, the commercial landlord chargepoint grant and the residential landlord infrastructure grant closed to new applications on 31 March 2026.

Sources
  1. Sitework GOV.UK installer finder sample, 15 September 2026. One central postcode searched in each of Westminster, Brighton, Manchester, Leeds, Norwich, Hereford, Bridport, Helmsley, Montrose, Bideford, Cirencester, Launceston, Llandrindod Wells, Enniskillen and Horncastle; the ten results returned for each were counted for a listed website link. No installer is named here. GOV.UK, Find an electric vehicle chargepoint installer
  2. Sitework electrician lead-sheet audit: 1,095 electricians across 76 UK towns, 828 homepages read between 30 August and 2 September 2026, page title and meta description checked for EV charging and OZEV mentions.
  3. Office for Zero Emission Vehicles, "Changes to electric vehicle chargepoint grant schemes from 1 April 2026", published 25 February 2026, for the £350 to £500 socket cap, the 31 March 2027 funding date, the three closed schemes and the four claim photos. Read 15 September 2026. GOV.UK
  4. GOV.UK Find a grant, "Electric Vehicle Chargepoint Grant for Renters and Flat Owners", for 75% of the cost up to £500, the requirement to use an OZEV authorised installer and eligible chargepoint, and the 31 March 2027 closing date. Read 15 September 2026. find-government-grants.service.gov.uk
  5. OZEV, "Residential and commercial chargepoints: become an authorised installer", updated 1 April 2026, for the competent person schemes and ECA memberships accepted, and grant eligibility starting from the date of authorisation. Read 15 September 2026. GOV.UK
  6. OZEV, "Eligible EV chargepoint model list". Read 15 September 2026. GOV.UK
  7. Office for Product Safety and Standards, "Regulations: electric vehicle smart charge points", updated 23 April 2024, for the regulations applying in England, Scotland and Wales and not in Northern Ireland. Read 15 September 2026. GOV.UK
  8. Sitework pricing, for the Website, Groundwork and Local Reach plans and what each includes. sitework.uk/#pricing
Done-for-you · £50 every four weeks

A site worth the click from GOV.UK Free mockup first

Send me your trade, your scheme and the towns you cover, and I will build a free mockup of your actual business, OZEV authorisation and all, before you pay anything. No deposit and no build fee: £50 every four weeks covers the site, hosting, the domain, SSL, backups and unlimited small text and photo edits, including the next time the grant changes. Three months minimum and then rolling. If you do not like the finished site your first payment comes back, and after twelve months the website files and the domain transfer to you with no exit fee. Live in about a week.